Connect the scheme design, deepen the construction in the later stage, control the details, and complete the feasibility scheme construction drawing in the process and use.In the later stage, if necessary, the project can enter the site and cooperate with the construction manager to complete the acceptance of as-built drawing, node drawing, construction deepening and material related typesetting